How Long Does a Six Sigma Project Take?

The best time that I know of was 24 hours, with savings of $3.6 million.  That’s a complete project, with all the usual steps.  To be fair, that was done by an experienced Master Black Belt, not someone doing their first project.

Return to Blog Posts >>

Leave a Reply

Your email address will not be published. Required fields are marked *